SPEAKERS

Christoph Deppe

Mine Planning Engineer
FLSmidth
Session:

Day 2 - Surface Mining Session - 14:10-14:35 - Considerations for optimising uptime in IPCC planning

Christoph Deppe is a 35-year old mining engineer, working as a Mine Planning Engineer for FLS’s Crushing Stations and Conveying business line. He studied Mineral Resources Engineering at the RWTH University in Aachen with short stints at the TU Delft and the Aalto University in Helsinki, before joining thyssenkrupp’s Mining Technologies division. Within FLS he has worked on several IPCC projects and studies covering all equipment for IPCC, including crushing stations, overland conveyors and stockpile equipment from the point of view of technical and economic feasibility.